Concrete Volume Calculator

Estimate cubic yards of concrete and 80 lb bag count for a slab, footing, or column. Includes a 10% waste allowance by default.

Results

Net volume
With waste
Cubic yards
80 lb bags (approx)

An 80 lb bag yields about 0.6 cubic feet. For pours over ~1 yd³, ready-mix is usually cheaper than bagged.

Last reviewed: April 2026

Tools we used or recommend for this work: a magnesium screed (Marshalltown 14 in), a bull float, a Quikrete or Sakrete 80 lb mix bag if you came in under 1 cu yd (otherwise a ready-mix order), and rebar stakes if this is a slab. Links may be affiliate-tagged where the brand has a program.